{"id":2726,"date":"2015-01-30T16:23:17","date_gmt":"2015-01-30T16:23:17","guid":{"rendered":"http:\/\/isabelbarrosarchitects.ie\/blog\/?p=2726"},"modified":"2015-05-29T13:58:43","modified_gmt":"2015-05-29T13:58:43","slug":"from-wood-to-energy","status":"publish","type":"post","link":"https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/","title":{"rendered":"From Wood to Energy"},"content":{"rendered":"<p>The Monastery of Klosterneuburg in Austria provides a fantastic example of autonomy, sustainability and a responsibility to both people and nature.<\/p>\n<p>Their biomass heating plant was part of the <a href=\"http:\/\/isabelbarrosarchitects.ie\/blog\/renewable-energy-research-trip-to-austria\/\" target=\"_blank\">Renewable Energy Research Trip to Austria.<\/a><\/p>\n<p>This underground biomass heating plant built in just twelve months in 2003 not only supplies heating to the monastery but also provides power from renewable biomass to the hospital, the town hall and a leisure center in Klosterneuburg via the utility company.<\/p>\n<p>The plant gets the wooden chips mainly from 4 forest districts nearby the plant (maximum transport distance 10km). The chip containers are filled every 2-3 months.<\/p>\n<p>A\u00a02.5 MW biomass boiler was constructed as well as an electricity and heat generation by an ORC (organic rankine cycle) process producing 200 kW of electrical energy and 1.0 MW of heat. The big boiler (2.5MW) is only used during winter time.<\/p>\n<p>The assessment of the heating requirements of the monastery and of the neighbouring recreational centre &#8220;Happyland&#8221; resulted in an annual heat requirement of 11,550 MWh per year.\u00a0In 2010 the biomass plant was able to produce 17,557MWh (see more facts on the images below).<\/p>\n<p>More details about the operation of this biomass plant <a href=\"http:\/\/old.ic-group.org\/index.php?id=160&amp;lang=en\" target=\"_blank\">here<\/a>.<\/p>\n<p align=\"LEFT\">The entire facility (heating plant, biomass storehouse, wine cellar, parking garage for buses and private vehicles) was built underground. This was a special challenge for the mechanical engineering team and the architectural concept was designed by Heinz Tesar.<\/p>\n<p align=\"LEFT\">\u00a0<a href=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2730\" src=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-1.jpg\" alt=\"Stift Klosterneuburg_Biomass Plant\" width=\"2480\" height=\"3507\" srcset=\"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-1.jpg 2480w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-1-212x300.jpg 212w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-1-724x1024.jpg 724w\" sizes=\"auto, (max-width: 2480px) 100vw, 2480px\" \/><\/a><a href=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2731\" src=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-2.jpg\" alt=\"Stift Klosterneuburg_Biomass Plant\" width=\"2480\" height=\"3507\" srcset=\"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-2.jpg 2480w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-2-212x300.jpg 212w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-2-724x1024.jpg 724w\" sizes=\"auto, (max-width: 2480px) 100vw, 2480px\" \/><\/a><\/p>\n<div id=\"attachment_2737\" style=\"width: 1210px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-14.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2737\" class=\"size-full wp-image-2737\" src=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-14.jpg\" alt=\"Stift Klosterneuburg_Biomass Plant\" width=\"1200\" height=\"1600\" srcset=\"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-14.jpg 1200w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-14-225x300.jpg 225w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-14-768x1024.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a><p id=\"caption-attachment-2737\" class=\"wp-caption-text\">Access to the underground biomass plant<\/p><\/div>\n<div id=\"attachment_2738\" style=\"width: 1210px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-20.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2738\" class=\"size-full wp-image-2738\" src=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-20.jpg\" alt=\"Stift Klosterneuburg_Biomass Plant\" width=\"1200\" height=\"1600\" srcset=\"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-20.jpg 1200w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-20-225x300.jpg 225w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-20-768x1024.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a><p id=\"caption-attachment-2738\" class=\"wp-caption-text\">The wood chips were quite warm to the touch<\/p><\/div>\n<p align=\"LEFT\"><a href=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-21.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2739\" src=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-21.jpg\" alt=\"Stift Klosterneuburg_Biomass Plant\" width=\"1200\" height=\"1600\" srcset=\"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-21.jpg 1200w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-21-225x300.jpg 225w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-21-768x1024.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a><\/p>\n<div id=\"attachment_2740\" style=\"width: 1210px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-23.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2740\" class=\"size-full wp-image-2740\" src=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-23.jpg\" alt=\"Stift Klosterneuburg_Biomass Plant\" width=\"1200\" height=\"1600\" srcset=\"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-23.jpg 1200w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-23-225x300.jpg 225w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-23-768x1024.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a><p id=\"caption-attachment-2740\" class=\"wp-caption-text\">Hatch from where the chips are unloaded<\/p><\/div>\n<p align=\"LEFT\"><a href=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-25.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2741\" src=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-25.jpg\" alt=\"2011_11_23_Smart City Project Klosterneuburg (25)\" width=\"1200\" height=\"1600\" srcset=\"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-25.jpg 1200w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-25-225x300.jpg 225w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-25-768x1024.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a> <a href=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-30.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2743\" src=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-30.jpg\" alt=\"2011_11_23_Smart City Project Klosterneuburg (30)\" width=\"1200\" height=\"1600\" srcset=\"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-30.jpg 1200w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-30-225x300.jpg 225w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-30-768x1024.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a> <a href=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-36.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2744\" src=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-36.jpg\" alt=\"2011_11_23_Smart City Project Klosterneuburg (36)\" width=\"1600\" height=\"1200\" srcset=\"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-36.jpg 1600w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-36-300x225.jpg 300w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-36-1024x768.jpg 1024w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/a> <a href=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-37.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2745\" src=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-37.jpg\" alt=\"2011_11_23_Smart City Project Klosterneuburg (37)\" width=\"1200\" height=\"1600\" srcset=\"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-37.jpg 1200w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-37-225x300.jpg 225w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-37-768x1024.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a><\/p>\n<div id=\"attachment_2732\" style=\"width: 1510px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-3-ALL-e1421279441857.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2732\" class=\"size-full wp-image-2732\" src=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-3-ALL-e1421279441857.jpg\" alt=\"Stift Klosterneuburg_Biomass Plant\" width=\"1500\" height=\"1918\" \/><\/a><p id=\"caption-attachment-2732\" class=\"wp-caption-text\">Organic Carbon cycle<\/p><\/div>\n<div id=\"attachment_2735\" style=\"width: 4874px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-4-ALL1.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2735\" class=\"size-full wp-image-2735\" src=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-4-ALL1.jpg\" alt=\"Stift Klosterneuburg_Biomass Plant\" width=\"4864\" height=\"3083\" srcset=\"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-4-ALL1.jpg 4864w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-4-ALL1-300x190.jpg 300w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-4-ALL1-1024x649.jpg 1024w\" sizes=\"auto, (max-width: 4864px) 100vw, 4864px\" \/><\/a><p id=\"caption-attachment-2735\" class=\"wp-caption-text\">From the forest to the heating plant<\/p><\/div>\n<div id=\"attachment_2736\" style=\"width: 4832px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-5-ALL.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-2736\" class=\"size-full wp-image-2736\" src=\"http:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-5-ALL.jpg\" alt=\"Stift Klosterneuburg_Biomass Plant\" width=\"4822\" height=\"2933\" srcset=\"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-5-ALL.jpg 4822w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-5-ALL-300x182.jpg 300w, https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/Stift-Klosterneuburg_Bioenergy-Plant-5-ALL-1024x623.jpg 1024w\" sizes=\"auto, (max-width: 4822px) 100vw, 4822px\" \/><\/a><p id=\"caption-attachment-2736\" class=\"wp-caption-text\">Biomass power generation process<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The biomass heating plant was part of the Renewable Energy Research Trip to Austria.<\/p>\n<p>This underground biomass heating plant built in just twelve months in 2003 not only supplies heating to the monastery but also provides power from renewable biomass to the hospital, the town hall and a leisure center in Klosterneuburg via the utility company.<\/p>\n","protected":false},"author":1,"featured_media":2742,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[19,10],"tags":[80,105,102],"class_list":["post-2726","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","category-sustainability","tag-austria","tag-energy","tag-sustainability","post-preview"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>From Wood to Energy - Isabel Barros Architects - Blog<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"From Wood to Energy - Isabel Barros Architects - Blog\" \/>\n<meta property=\"og:description\" content=\"The biomass heating plant was part of the Renewable Energy Research Trip to Austria.  This underground biomass heating plant built in just twelve months in 2003 not only supplies heating to the monastery but also provides power from renewable biomass to the hospital, the town hall and a leisure center in Klosterneuburg via the utility company.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/\" \/>\n<meta property=\"og:site_name\" content=\"Isabel Barros Architects - Blog\" \/>\n<meta property=\"article:published_time\" content=\"2015-01-30T16:23:17+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2015-05-29T13:58:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-26.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"1600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"barros\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"barros\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/from-wood-to-energy\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/from-wood-to-energy\\\/\"},\"author\":{\"name\":\"barros\",\"@id\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/#\\\/schema\\\/person\\\/cce1ca0250b5f3eea105850e52d50f5d\"},\"headline\":\"From Wood to Energy\",\"datePublished\":\"2015-01-30T16:23:17+00:00\",\"dateModified\":\"2015-05-29T13:58:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/from-wood-to-energy\\\/\"},\"wordCount\":313,\"commentCount\":4,\"image\":{\"@id\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/from-wood-to-energy\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/wp-content\\\/uploads\\\/2015\\\/01\\\/2011_11_23_Smart-City-Project-Klosterneuburg-26.jpg\",\"keywords\":[\"Austria\",\"Energy\",\"Sustainability\"],\"articleSection\":[\"Energy\",\"Sustainability\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/from-wood-to-energy\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/from-wood-to-energy\\\/\",\"url\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/from-wood-to-energy\\\/\",\"name\":\"From Wood to Energy - Isabel Barros Architects - Blog\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/from-wood-to-energy\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/from-wood-to-energy\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/wp-content\\\/uploads\\\/2015\\\/01\\\/2011_11_23_Smart-City-Project-Klosterneuburg-26.jpg\",\"datePublished\":\"2015-01-30T16:23:17+00:00\",\"dateModified\":\"2015-05-29T13:58:43+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/#\\\/schema\\\/person\\\/cce1ca0250b5f3eea105850e52d50f5d\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/from-wood-to-energy\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/from-wood-to-energy\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/from-wood-to-energy\\\/#primaryimage\",\"url\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/wp-content\\\/uploads\\\/2015\\\/01\\\/2011_11_23_Smart-City-Project-Klosterneuburg-26.jpg\",\"contentUrl\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/wp-content\\\/uploads\\\/2015\\\/01\\\/2011_11_23_Smart-City-Project-Klosterneuburg-26.jpg\",\"width\":1200,\"height\":1600},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/from-wood-to-energy\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"From Wood to Energy\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/\",\"name\":\"Isabel Barros Architects - Blog\",\"description\":\"design + energy + excellence\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/#\\\/schema\\\/person\\\/cce1ca0250b5f3eea105850e52d50f5d\",\"name\":\"barros\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/22ae2cef2234f7e7b91b4ae8a93741d287206dde09c8beeb087d936fb9889373?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/22ae2cef2234f7e7b91b4ae8a93741d287206dde09c8beeb087d936fb9889373?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/22ae2cef2234f7e7b91b4ae8a93741d287206dde09c8beeb087d936fb9889373?s=96&d=mm&r=g\",\"caption\":\"barros\"},\"sameAs\":[\"http:\\\/\\\/www.isabelbarrosarchitects.ie\"],\"url\":\"https:\\\/\\\/isabelbarrosarchitects.ie\\\/blog\\\/author\\\/barros\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"From Wood to Energy - Isabel Barros Architects - Blog","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/","og_locale":"en_GB","og_type":"article","og_title":"From Wood to Energy - Isabel Barros Architects - Blog","og_description":"The biomass heating plant was part of the Renewable Energy Research Trip to Austria.  This underground biomass heating plant built in just twelve months in 2003 not only supplies heating to the monastery but also provides power from renewable biomass to the hospital, the town hall and a leisure center in Klosterneuburg via the utility company.","og_url":"https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/","og_site_name":"Isabel Barros Architects - Blog","article_published_time":"2015-01-30T16:23:17+00:00","article_modified_time":"2015-05-29T13:58:43+00:00","og_image":[{"width":1200,"height":1600,"url":"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-26.jpg","type":"image\/jpeg"}],"author":"barros","twitter_card":"summary_large_image","twitter_misc":{"Written by":"barros","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/#article","isPartOf":{"@id":"https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/"},"author":{"name":"barros","@id":"https:\/\/isabelbarrosarchitects.ie\/blog\/#\/schema\/person\/cce1ca0250b5f3eea105850e52d50f5d"},"headline":"From Wood to Energy","datePublished":"2015-01-30T16:23:17+00:00","dateModified":"2015-05-29T13:58:43+00:00","mainEntityOfPage":{"@id":"https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/"},"wordCount":313,"commentCount":4,"image":{"@id":"https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/#primaryimage"},"thumbnailUrl":"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-26.jpg","keywords":["Austria","Energy","Sustainability"],"articleSection":["Energy","Sustainability"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/","url":"https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/","name":"From Wood to Energy - Isabel Barros Architects - Blog","isPartOf":{"@id":"https:\/\/isabelbarrosarchitects.ie\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/#primaryimage"},"image":{"@id":"https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/#primaryimage"},"thumbnailUrl":"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-26.jpg","datePublished":"2015-01-30T16:23:17+00:00","dateModified":"2015-05-29T13:58:43+00:00","author":{"@id":"https:\/\/isabelbarrosarchitects.ie\/blog\/#\/schema\/person\/cce1ca0250b5f3eea105850e52d50f5d"},"breadcrumb":{"@id":"https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/#primaryimage","url":"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-26.jpg","contentUrl":"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-content\/uploads\/2015\/01\/2011_11_23_Smart-City-Project-Klosterneuburg-26.jpg","width":1200,"height":1600},{"@type":"BreadcrumbList","@id":"https:\/\/isabelbarrosarchitects.ie\/blog\/from-wood-to-energy\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/isabelbarrosarchitects.ie\/blog\/"},{"@type":"ListItem","position":2,"name":"From Wood to Energy"}]},{"@type":"WebSite","@id":"https:\/\/isabelbarrosarchitects.ie\/blog\/#website","url":"https:\/\/isabelbarrosarchitects.ie\/blog\/","name":"Isabel Barros Architects - Blog","description":"design + energy + excellence","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/isabelbarrosarchitects.ie\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/isabelbarrosarchitects.ie\/blog\/#\/schema\/person\/cce1ca0250b5f3eea105850e52d50f5d","name":"barros","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/22ae2cef2234f7e7b91b4ae8a93741d287206dde09c8beeb087d936fb9889373?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/22ae2cef2234f7e7b91b4ae8a93741d287206dde09c8beeb087d936fb9889373?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/22ae2cef2234f7e7b91b4ae8a93741d287206dde09c8beeb087d936fb9889373?s=96&d=mm&r=g","caption":"barros"},"sameAs":["http:\/\/www.isabelbarrosarchitects.ie"],"url":"https:\/\/isabelbarrosarchitects.ie\/blog\/author\/barros\/"}]}},"_links":{"self":[{"href":"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-json\/wp\/v2\/posts\/2726","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-json\/wp\/v2\/comments?post=2726"}],"version-history":[{"count":0,"href":"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-json\/wp\/v2\/posts\/2726\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-json\/wp\/v2\/media\/2742"}],"wp:attachment":[{"href":"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-json\/wp\/v2\/media?parent=2726"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-json\/wp\/v2\/categories?post=2726"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/isabelbarrosarchitects.ie\/blog\/wp-json\/wp\/v2\/tags?post=2726"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}